Posts tagged FODS In The Field
FODS Gains Traction In Texas

Industries across Texas are using FODS to provide cost-effective, and environmentally friendly construction entrances that reduce trackout and maintenance.

Read More
Nashville Projects

FODS is used on multiple projects throughout Tennessee. TDOT approval opens doors for Kiewit to use FODS on I-440 project. The town of Gallatin welcomes a large datacenter with high-volume clean energy demands. New Nashville Fairgrounds Stadium project uses FODS to stop the mud.

Read More
Central 70 Project

At over 30 years beyond the expected lifespan of the bridge, Central I-70 was showing signs of age in terms of both deterioration and traffic congestion. The Central 70 Project addressed future growth needs by renovating a 10 mile stretch of I-70.

Read More
O'Hare International Airport

FH Paschen reduces aviation FOD with FODS Reusable Construction Entrance on $8.5 Billion O’Hare 21 Project.

Read More
Central Tri-State Tollway I-294 Project

Old Veterans Construction deploys FODS on massive central Tri-State tollway I-294 Widening and reconstruction project.

Read More
Solar Farm

MaxGen Energy Services, a nationwide service provider for clean energy infrastructure, provides preventative and corrective maintenance for solar farms, as well as immediate responses during emergencies. Learn how MaxGen Energy Services uses FODS to tackle critical solar farm service jobs and remain compliant with Storm Water Pollution Prevention Plans.

Read More
27th Street Storm Drain Project

During excavation, shoring, and construction of the drainage pipeline, FODS Reusable Construction Entrance is currently doing a tough job of stopping soil from tracking out into public streets and onto sidewalks, and mitigating dust to nearby residences.

Read More
ALDOT 5920 Bridge Project

The I-59/20 junction in the Birmingham Central Business District provides service to over 165,000 travelers every day. These bridges were showing signs of age in terms of both structural damages and traffic congestion earning the colloquial name “The Malfunction Junction.” The major phase of the project involving the I-59/20 junction was completed in record time a full two months earlier than projected.

Read More
Chennault International Airport

Chennault International Airport, Aerospace Hub, evaluates FODS as an effective trackout device for FOD management and control. Trackout Control mats are used to reduce sediment that is tracked onto the airfield and apron to reduce risks and maintenance of FOD.

Read More
JWA Oil - FODS Melbourne Trials

FODS has partnered with JWA Oil to offer the composite rumble pad alternative throughout Australia.

Read More
Harris County Greens Bayou

FODS reduces street sweeping by 59% on Harris County excavation project.

Read More