Posts in Water
BCRUA Water Collection Infrastructure Project

Civil engineers in North Austin are deploying FODS stabilized construction exit to prevent sedimentation while undergoing construction on Texas’s largest raw water project. FODS is a portable, reusable vehicle track-out control solution that can be permanently installed as a complete solution. Learn more about municipalities that have integrated the FODS Trackout Control system to reduce maintenance costs and increase compliance and safety.

Read More
DEN Gate Expansion Program

As one of the nation’s most traveled airports, Denver International Airport (DEN) continues to add gates to increase capacity for over 60 million annual travellers. In 2022, DIA’s Gate Expansion Program completed the addition of 39 gates which increased the airports capacity by 30%. FODS Trackout Control System was deployed throughout the project to safely mitigate construction vehicle track out and reduce FOD on access roads. The FODS system is becoming the preferred solution for mitigating construction track out and preventing vehicle related Foreign Object Debris (FOD) on airports around the globe.

Read More
Erie North Water Reclamation Facility Expansion

Erie’s North Water Reclamation Facility is undergoing major improvement to increase capacity for the growing town. The improvements will continue until 2028 as the plant is upgraded to a Class A facility which can provide safe water for additional applications. Archer Western is contracted to perform the work and is using FODS Trackout Control Mats to as the Stabilized Construction Entrance BMP to minimize vehicle sediment tracking.

Read More
Big Dry Creek Sewer Improvements Project

The Big Dry Creek Sewer Improvements Project involves the renovation of 14 miles of sewer pipeline in the city of Westminster, CO. The renovation will increase capacity and prepare the city’s infrastructure for future developments. The frequent relocation of construction zones throughout the project prompted the contractor to choose a reusable and portable construction entrance to stay compliant and mobile.

Read More
27th Street Storm Drain Project

During excavation, shoring, and construction of the drainage pipeline, FODS Reusable Construction Entrance is currently doing a tough job of stopping soil from tracking out into public streets and onto sidewalks, and mitigating dust to nearby residences.

Read More
Harris County Greens Bayou

FODS reduces street sweeping by 59% on Harris County excavation project.

Read More