Miami’s I-395/SR 836/I-95 Design-Build Project which includes the arched Signature Bridge encompasses over 5 miles of highway and state roadways. Archer Western & de Moya Group Joint Venture have deployed FODS Soil Tracking Prevention Device as a Vehicle Tracking Control Measure throughout the project. The reusable system can be relocated through each phase of the project.
Read MoreThe San Diego International Airport is undergoing a major renovation of Terminal 1 which will create and additional 11 gates along with new seating areas and restaurants. The New T1 Project will also include a two level drop-off/pick-up area which will provide pedestrian access to Terminal 2, a new administration building, and a three lane road to the terminal which will streamline traffic and reduce congestion on nearby roadways.
Read MorePlace our FOD Prevention System of mats at your airfield entrances and on your internal access roads to eliminate and minimize FOD before it can enter the airside.
Read MoreFH Paschen reduces aviation FOD with FODS Reusable Construction Entrance on $8.5 Billion O’Hare 21 Project.
Read More