At over 30 years beyond the expected lifespan of the bridge, Central I-70 was showing signs of age in terms of both deterioration and traffic congestion. The Central 70 Project addressed future growth needs by renovating a 10 mile stretch of I-70.
Read MoreDuring excavation, shoring, and construction of the drainage pipeline, FODS Reusable Construction Entrance is currently doing a tough job of stopping soil from tracking out into public streets and onto sidewalks, and mitigating dust to nearby residences.
Read MoreFODS has partnered with JWA Oil to offer the composite rumble pad alternative throughout Australia.
Read More