Titan America, a leading construction material supplier, is using FODS on multiple locations throughout Florida to mitigate vehicle track-out, increase safety, and reduce costs. The system has proved effective on varied site conditions and demonstrates Titan America’s commitment to environmental responsibility.
Read MoreMiami’s I-395/SR 836/I-95 Design-Build Project which includes the arched Signature Bridge encompasses over 5 miles of highway and state roadways. Archer Western & de Moya Group Joint Venture have deployed FODS Soil Tracking Prevention Device as a Vehicle Tracking Control Measure throughout the project. The reusable system can be relocated through each phase of the project.
Read MoreFODS Ground Protection Mats were using during demolition work at Tampa Convention Center’s new waterfront meeting rooms. The mats were placed over existing brick work, which extended out to the Tampa River Walk, to provide site access for vehicles and pedestrians during demolition.
Read More