The Old Alabama Highway Widening Project would create additional lanes along nearly six miles between Paga Mine Road and Highway 113 (Rockmart Highway). CW Matthews chose FODS Trackout Control System which enabled an 80% reduction of street sweeping compared to traditional aggregate style construction entrances.
Read MoreFODS Ground Protection Mats were using during demolition work at Tampa Convention Center’s new waterfront meeting rooms. The mats were placed over existing brick work, which extended out to the Tampa River Walk, to provide site access for vehicles and pedestrians during demolition.
Read More