Miami’s I-395/SR 836/I-95 Design-Build Project which includes the arched Signature Bridge encompasses over 5 miles of highway and state roadways. Archer Western & de Moya Group Joint Venture have deployed FODS Soil Tracking Prevention Device as a Vehicle Tracking Control Measure throughout the project. The reusable system can be relocated through each phase of the project.
Read MoreThe San Diego International Airport is undergoing a major renovation of Terminal 1 which will create and additional 11 gates along with new seating areas and restaurants. The New T1 Project will also include a two level drop-off/pick-up area which will provide pedestrian access to Terminal 2, a new administration building, and a three lane road to the terminal which will streamline traffic and reduce congestion on nearby roadways.
Read More