Posts tagged wastewater
Titan America Implements FODS To Minimize Vehicle Track-Out

Titan America, a leading construction material supplier, is using FODS on multiple locations throughout Florida to mitigate vehicle track-out, increase safety, and reduce costs. The system has proved effective on varied site conditions and demonstrates Titan America’s commitment to environmental responsibility.

Read More
Landfill Sites Implementing FODS Trackout Control System

Landfills across the country are turning to FODS to reduce sediment tracking. FODS is a portable, reusable vehicle track-out control solution which can be permanently installed as a complete solution or used in conjunction with wheel wash systems or other Vehicle Trackout Control BMPs to improve performance. Learn more about landfills that have integrated the FODS Trackout Control system to reduce costs and increase compliance and safety.

Read More
DEN Gate Expansion Program

As one of the nation’s most traveled airports, Denver International Airport (DEN) continues to add gates to increase capacity for over 60 million annual travellers. In 2022, DIA’s Gate Expansion Program completed the addition of 39 gates which increased the airports capacity by 30%. FODS Trackout Control System was deployed throughout the project to safely mitigate construction vehicle track out and reduce FOD on access roads. The FODS system is becoming the preferred solution for mitigating construction track out and preventing vehicle related Foreign Object Debris (FOD) on airports around the globe.

Read More
Erie North Water Reclamation Facility Expansion

Erie’s North Water Reclamation Facility is undergoing major improvement to increase capacity for the growing town. The improvements will continue until 2028 as the plant is upgraded to a Class A facility which can provide safe water for additional applications. Archer Western is contracted to perform the work and is using FODS Trackout Control Mats to as the Stabilized Construction Entrance BMP to minimize vehicle sediment tracking.

Read More
1919 At Mile High Apartments

In response to rapid urban expansion, The Opus Group (Opus) began construction of its third multi-family development in Denver’s Jefferson Park neighborhood. The experienced building and engineering teams found solutions to the unique challenges posed by the varied topography and space constraints of the project. Opus installed FODS Reusable Construction Entrance System on the three entrances to minimize vehicle sediment tracking onto the active roads.

Read More
FODS Deployed on I-25 South Gap Project

Interstate 25 is a major north-south interstate which connects Denver and cities and communities along the Front Range to the National Highway System. The growing population prompted expansions both north and south of the Denver Metro area. FODS Reusable Construction Entrance System enables contractors to quickly establish stabilized access points during each phase of the project.

Read More
Big Dry Creek Sewer Improvements Project

The Big Dry Creek Sewer Improvements Project involves the renovation of 14 miles of sewer pipeline in the city of Westminster, CO. The renovation will increase capacity and prepare the city’s infrastructure for future developments. The frequent relocation of construction zones throughout the project prompted the contractor to choose a reusable and portable construction entrance to stay compliant and mobile.

Read More