The I-10 Flyover Ramp Project aims to reduce congestion from westbound I-10 traffic exiting onto the College Drive exit. The Flyover redirects traffic over the I-12 to eliminate the need to merge past multiple lanes of traffic. FODS Trackout Control System was deployed to reduce construction site sediment tracking.
Read More