Posts tagged Permanent Application
I-10 & I-12 College Flyover Ramp Project

The I-10 Flyover Ramp Project aims to reduce congestion from westbound I-10 traffic exiting onto the College Drive exit. The Flyover redirects traffic over the I-12 to eliminate the need to merge past multiple lanes of traffic. FODS Trackout Control System was deployed to reduce construction site sediment tracking.

Read More
Catbird: A New Concept Hybrid Hotel

The Catbird Hotel is constructed on the corner of Marion and Walnut in Denver’s RiNo Arts District. Using innovative building materials, construction crews would assemble each floor in under three weeks as the pre-manufactured structural and exterior panels were delivered to the site. Construction in urban environments requires contractors to deploy effective and safe BMPs to prevent sedimentation and water pollution from exiting vehicles. The FODS Trackout Control Mats were to used on all three site entrances to provide access to the frequent delivery trucks and construction vehicles.

Read More
Cumberland County Landfill

The Cumberland County Landfill was opened in the 1970s and is a municipal solid waste landfill that contracts with residual waste generators in Pennsylvania and surrounding states. To minimize trackout, the FODS Stabilized Construction Entrance was installed near the site’s weigh station. The system provides an effective solution to vehicle sediment tracking enabling increased compliance at reducing operating costs.

Read More