Posts tagged composite Construction Entrnace
CASE STUDY: FODS Reusable Construction Entrance on CDOT $350 Million Dollar Interstate 25 GAP Project

FODS Reusable compact construction entrances were installed along the I-25 corridor and allowed heavy equipment vehicles to enter and exit the interstate without causing trackout and dust to passing motorists.

Read More
CASE STUDY: FH Paschen Reduces Aviation Risks with FODS Reusable Rockless Stabilized Construction Entrance on $8.5 Billion Dollar O’Hare 21 Project, Chicago, Illinois

The expedited nature of the large-scale project on an active airfield, in one of world’s busiest airports required multiple rapid installation and movable entrances, while maintaining aircraft traffic movements , and critical Aircraft Rescue and Recovery routes.

Read More