Sydney Build 2025
FODS 3rd Consecutive Year Attending Sydney Build
FODS, the global leader in trackout control solutions, is proud to announce its return to the Sydney Build Expo for the third consecutive time. The company will exhibit its award-winning Trackout Control Mats at the International Convention Centre (ICC) in Sydney on May 7th and 8th, 2025. As one of the industry’s most anticipated events, Sydney Build Expo brings together thousands of professionals from the construction, infrastructure, and civil engineering sectors—and FODS is once again taking center stage with its sustainable, high-performance alternative to traditional stabilized construction entrances.
The FODS Trackout Control Mat, designed to prevent mud, dirt, and debris from being tracked off construction sites and onto public roads, has gained global recognition as an environmentally responsible, reusable, and cost-effective solution. Made from high-strength composite materials, the mats eliminate the need for aggregate rock pads, significantly reducing waste, site disturbance, and ongoing maintenance costs. This year’s expo marks another milestone for FODS as it continues to expand its presence in the Australian and Asia-Pacific construction markets.
Attendees visiting the FODS booth will have the opportunity to see the mats up close, explore case studies from recent Australian projects, and learn how the system integrates into erosion and sediment control plans. FODS representatives will be on hand to discuss deployment strategies, cleaning and maintenance practices, and compliance with Australian environmental regulations.
In addition to showcasing its core product, FODS will highlight its partnerships with Australian distributors and its expanding footprint in infrastructure, energy, and urban development projects. Over the past two years, FODS mats have been deployed across a range of Australian construction sites, including renewable energy installations, highway expansions, and large-scale commercial developments. The mats have proven especially valuable on sites with limited space, strict environmental controls, and challenging soil conditions.
The FODS Trackout Control Mat has been adopted in over 15 countries worldwide and has been credited with reducing trackout by up to 59% while cutting maintenance and replacement costs by over 90% compared to traditional aggregate-based systems. Its durability and ease of installation have made it a preferred solution for both temporary and long-term construction sites.This year’s Sydney Build Expo is expected to draw over 20,000 construction professionals, offering a dynamic forum for networking, innovation, and collaboration. FODS invites all attendees to visit their booth to learn more about improving site compliance, reducing environmental impact, and achieving operational efficiencies with its proven trackout control technology.FODS will be exhibiting at Booth [insert booth number if known] on May 7–8 at theInternational Convention Centre Sydney.
Read more at the Sydney Build Website.
Trade Show Details
Dates:
Exhibits: May 7th - 8th
Address:
ICC Sydney, Exhibition Centre
14 Darling Dr
Sydney NSW 2000
FODS Location
Booth L-15
What is the FODS Reusable Construction Entrance?
FODS is the global leader in reusable trackout control. The FODS Trackout Control Mat System provides a durable, reusable construction entrance to minimize sediment and debris tracking. With FODS, contractors can quickly establish a stabilized entrance and easily relocate access locations for each phase.
The FODS system is made of extremely durable HDPE and is designed to last over 10 years in the field. With a 3 year warranty, FODS mats offer contractors an effective solution for erosion and sediment control.
With FODS contractors can:
Greatly reduce construction entrance costs
Improve compliance with NPDES regulations
Reduce maintenance costs
Minimize rocks tracking onto active roadways
Install over dirt, asphalt, and concrete (and more)
Deploy a stabilized entrance in 30 minutes
Save money on every project
Stay compliant with SWPPP and EPA guidelines by using FODS construction entrance that is up to 59% more effective than rock.