Posts tagged AlternativeToRipRapEntrances
CASE STUDY: FODS Reusable Construction Entrance on CDOT $350 Million Dollar Interstate 25 GAP Project

FODS Reusable compact construction entrances were installed along the I-25 corridor and allowed heavy equipment vehicles to enter and exit the interstate without causing trackout and dust to passing motorists.

Read More
Versatile. Durable. Reusable. FODS Environmental Rockless Trackout Control Entrance at the Oil & Gas Environmental Conference, December 3-4, Booth #44, Dallas, Texas

FODS Trackout Control System ensures that energy extraction activities comply with strict environmental local, state, and federal regulations Best Management Practices and SWPPP Plans, controlling trackout and debris from leaving extraction sites and entering public roadways and storm water runoff.

Read More