BACKGROUND

According to Los Angeles World Airport data (LAWA), 88 million people traveled through the Los Angeles airport in 2019 making LAX the second busiest airport in the United States and fourth busiest in the world. In response to its increasing passenger volume, LAX is in the midst of a $14 Billion dollar overhaul to its terminals, airfield, and landside access. The project is called the LAX Modernization Program, and is considered the largest public works project in the history of the city of Los Angeles.

A Fluor-led joint venture called LAX Integrated Express Solutions, or LINXS, was contracted by LAWA to design-build, finance, operate and complete the Modernization Program.

The joint venture includes notable partners such as:

  • Fluor Corp.

  • Balfour Beatty

  • ACS Infrastructure Development Inc.

  • Dragados USA

  • Hochtief PPP Solutions

  • Flatiron Construction Corp.

  • Bombardier Transportation

The LAX Modernization Program was initiated in 2013 and already completed infrastructure and renovation upgrades include: the new Tom Bradley International Terminal, the Great Hall, the Airport Response Coordination Center, the LAFD Aircraft Rescue and Firefighting Station No. 80, in addition to new aircraft gates, concourses, taxiways, taxilanes, and replacement of the Central Utility Plant.

Current Projects include: the Landside Access Modernization Program (LAMP), Terminals 1 & 7 Renovation, Midfield Satellite Concourse, the Curbside Appeal Project, and additional runway construction.

LAMP IMPROVES ACCESSIBILITY TO LAX

An estimated 50% of travelers arriving at LAX arrive by car and drop off travelers at the Central Terminal Area. Cars must circumnavigate a roadway known as the ‘horseshoe’ which wraps around the Central Terminal Area. This segment of the journey often takes motorists over an hour to complete. The number of vehicles is expected to increase as annual passenger volume continues to break records. The Landside Access Modernization Program (LAMP) was created to address this congestion and to provide access to the Central Terminal Area by public transportation.

The Landside Access Modernization Program is divided into five major program components: an Automated People Mover (APM), a Consolidated car rental center, and roadway improvements, and two Intermodal Transportation Facilities for additional parking, shipping, and ground transportation services. The largest component of the Landside Access Modernization Program is the $5.5 billion dollar Automated People Mover (APM) that is being constructed to remedy traffic congestion, provide easier accessibility to the airport, improve the airport’s carbon footprint, and prepare for the 2028 Olympics that will be hosted in Los Angeles.

APM+LAX-1.jpg

The APM will offset the equivalent of 12 million vehicle miles driven annually. The projected number of passengers is expected to surpass 30 million annually and offset an equivalent of 12 million miles driven annually. Trains will arrive every 2 minutes at the stations and it will take passengers 10 minutes to ride to the Tom Bradley International Terminal from the ConRAC facility.

The APM will consist of a 2.25 mile elevated electric train that is designed to provide reliable and affordable access to the Central Terminal Facilities. The APM is built to be efficient and environmentally responsible. The system will operate 44 electric powered train cars which will include regenerative braking to reduce power consumption, and will be made from materials which are 98% recyclable after their service life. In addition, the nearby LEED Gold Certified command center will generate over half of the consumed energy from solar sources. The train system will have nine stops, including 6 stations connecting the three terminals, the Consolidated Rent-A-Car (ConRAC), the regional light rail and transit system, offsite parking facilities, and new drop-off/pickup locations. The project which broke ground in 2019 is expected to be passenger ready in 2023.

CONSOLIDATED RENT-A-CAR FACILITY - WORLD’S LARGEST RENTAL CAR FACILITY

The high volumes of travelers passing through the LAX airport drives demand for transportation services. The area is the second busiest car rental market in the country, also contributing to the traffic conjestion near the Central Terminal Area. LAWA approved a $2 billion dollar agreement to construct the Consolidated Rent-A-Car Facility (ConRAC). The 6.4-million-square-foot building will consolidate rental car companies in one convenient location to improve efficiency and reduce traffic congestion.

The massive ConRAC facility is the largest of its kind in the world and second largest concrete structure in the US, next to the Pentagon. A concrete batch plant was constructed onsite to provide 233,000 cubic yards of concrete to the project. Working at a steady pace, a full year was required to pour the building’s concrete foundation. One hundred twenty-nine thousand cubic yards were also poured for the Ready Return and 44,000 cubic yards for the Quick Turn Around buildings (light rental car maintenance area). The facility includes a solar farm that will generate an estimated 8,400 megawatt hours annually. ConRAC will store and operate 18,000 rental cars and the new facility will service hundreds of thousands of travelers renting cars annually with a rental car leaving ConRAC approximately every two seconds during peak times.

Construction is expected to be completed in 2023 alongside the APM project.

Fugitive Dust, Stabilized Construction Entrances, and FOD Control

An accelerated upgrade while keeping one of the world’s busiest airports open requires a FODS rapid installation construction entrance that helps Flour joint venture stay on schedule and stay in compliance.

An accelerated upgrade while keeping one of the world’s busiest airports open requires a FODS rapid installation construction entrance that helps Flour joint venture stay on schedule and stay in compliance.

The Fluor Joint Venture faces the challenges of orchestrating one of the largest public work programs in Californian history with multiple projects occurring simultaneously. Fluor JV must maintain an expedited schedule on or near an active airfield without disrupting airport operations.

As part of the Clean Air Act, any major ground disturbing related operations must submit a fugitive dust control plan to the South Coast Air Quality Management District and obtain a permit before operations begin. South Coast AQMD is a regulatory agency responsible for improving air quality in southern California by reviewing plans and enforcing the permit requirements. According to Rule 403 of the South Coast AQMD Rule Book, contractors of ‘large operations’ must use best practices to reduce fugitive dust including watering 3 times a day or paving construction access roads at least 100 feet onto the site to control potential PM10 and other fugitive dust emissions. The heavy construction traffic carrying prefabricated steel structures enter the site daily are one source of dust. An effective stabilized construction entrance must be able to withstand a high volume of traffic of the 60,000 loads while mitigating dust emissions.

apm9-1.jpg

Construction next to runways poses a potential FOD risk.

Rule 403 requires the implementation of best available dust control measures (BACM) during active operations capable of generating fugitive dust. This rule also requires activities defined as “large operations” to notify the South Coast AQMD by submitting specific forms. A large operation is defined as any active operation on property containing 50 or more acres of disturbed surface area; or any earth moving operation with a daily earth-moving or throughput volume of 3,850 cubic meters (5,000 cubic yards), three times during the most recent 365 day period.

More Information

In addition to the dust control requirements, construction teams on both the APM and ConRAC projects must be mitigate sediment trackout to comply with NPDES stormwater permit requirements. The stabilized construction entrance/exit (TC-1) is designed to contain both sediment and debris on construction sites. As vehicles traverse through the egress and ingress points on the project, the sediment can be cleaned from the vehicle tires to avoid being deposited on active roadways.

FODS Trackout Control Mats installed on ConRAC site to provide stabilized construction entrance/exit TC-1 and FOD prevention while helping to reduce fugitive dust. Mats are formed into pyramids which deform vehicle tires and dislodge debris while providing a trap for sediment, trackout and construction debris. Debris collects the base of the mats away from subsequent vehicle tires.

FODS Trackout Control Mats installed on ConRAC site to provide stabilized construction entrance/exit TC-1 and FOD prevention while helping to reduce fugitive dust.

Mats are formed into pyramids which deform vehicle tires and dislodge debris while providing a trap for sediment, trackout and construction debris. Debris collects the base of the mats away from subsequent vehicle tires.

Because the projects are located in near proximity to the airport, contractors must adhere to an additional set of development requirements and regulations within the Airport Airside, Airport Landside, and Airport Landside Support Subareas. One serious matter at airports is FOD (Foreign Object Debris) control. FOD must be eliminated before it can enter the airfield. Any type of FOD including construction dust, human created debris, trackout and materials can collide with or be ingested by aircraft engines causing safety risks and millions of dollars in damages annually. Contractors must account for all types of construction FOD making sure any debris tracked out of the job site will not enter the airside. Furthermore, both sites are surrounded by, adjoin or cross over major thoroughfares and airport roadways where trackout can be a risk to motorists and/or tracked out onto runways and taxilanes.

CONSTRUCTION ENTRANCE BMP Modernization

To meet the construction requirements and regulatory standards, operators have chosen to use the FODS Trackout Control Mats on both the APM and ConRAC projects. The FODS system is designed to deform vehicle tires and allowing debris in tire treads to break loose. The system can minimize or prevent sediment track out, vehicle FOD, and fugitive debris from escaping the jobsite.

As a portable solution, the system can be relocated throughout each phase of the project. As the APM guideway and track progresses and site access changes, FODS mats have been relocated and reinstalled under the guideway. FODS Trackout Control Entrances are modular and can be installed to fit the dimensions required in each location. and are placed at main entrances to the ConRAC site.

FODS Reusable Construction Entrances provide a low maintenance construction entrance that effectively mitigates large operation dust emissions, airport FOD, and construction trackout. The mats are able to support fully loaded trailers and heavy equipment tires while also providing access for smaller passenger vehicles. The surface of the mats are covered with durable pyramids which compress and deform vehicle tire treads in all directions. Once compressed, the treads release mud, dust, and debris into the base of the FODS mat. Construction mud, debris, and FOD collect at the base of the mats and is contained on-site. The pyramids are designed to withstand over 80 tons of weight and have an expected service life of 10+ years. Mats can be configured to meet any entrance detail and installed in under 30 minutes without heavy equipment.

FODS rapid installation construction entrances continue to help Flour Joint Venture stay on schedule and stay in compliance with the large scale modernization project while keeping one of the world’s busiest airports free of debris, sediment, and foreign objects.

To find out more information on how we can help your project stay on schedule and in compliance contact 844-200-3637 or email us at info@getfods.com.

Request A Quote