Check out the video below

Why use fods?

FODS Trackout Control Mats installed at the Cotino, Storyliving by Disney construction site

Managing Trackout at Cotino, Disney's First Storyliving Community

Cotino, Disney’s first Storyliving community, is transforming 618 acres in Rancho Mirage into one of California’s most anticipated residential developments. With multiple builders active across the site, maintaining clean roads and organized site access became an important part of early construction.

Read More
FODS on Floyd Hill I-70 Project

Trackout Control on the I-70 Floyd Hill Project in Colorado

Trackout control along an active interstate corridor requires reliable, adaptable solutions to keep roads clean and crews moving safely.

Read More

Demeter Millwork Manufacturing Facility Expansion

Demeter Millwork is constructing a new 53,000-square-foot manufacturing facility in Woodridge, Illinois, to expand production of architectural millwork and custom interior fabrication. The state-of-the-art plant will increase manufacturing capacity while supporting jobs and industrial growth in the region.

Read More

Micron's Boise Semiconductor Fabrication Plant: A Strategic Investment

In September 2022, Micron announced its ambitious plan to expand its Boise Idaho headquarters with a leading-edge R&D and semiconductor “fab” or manufacturing facility. This monumental $15B project constitutes the largest single investment in the state of Idaho with $6B in federal funding from the CHIPS and Science Act for this site and another “megafab” site in Clay, New York.

Read More

FODS Trackout Control Mats Deployed at Padnos Turner Recycling Center

To mitigate sediment tracking and support EGLE compliance, PADNOS replaced its conventional aggregate-based trackout pad with the FODS Trackout Control System, marking a shift toward more sustainable and performance-driven infrastructure.

Read More

MCAS - Yuma Adds a New Weapon to their Arsenal

Historically, FOD management at MCAS Yuma relied on labor-intensive manual inspections—a time-consuming process that, while effective, left room for improvement. In May 2024, the air station introduced a new solution: FODS Trackout Control Mats. The results not only exceeded expectations but also redefined FOD management at one of the U.S. Marine Corps’ most critical installations.

Read More

David Booth Memorial Stadium - University of Kansas

The University of Kansas (KU), located in Lawrence, Kansas, which is just 40-miles west of Kansas City, Kansas and home to nearly 30,000 undergraduates and graduate students is undertaking a major $448 million renovation of the iconic David Booth Kansas Memorial Stadium. Led by Athletic Director Travis Goff, this transformative project aims to modernize not only the stadium but is part of the larger “Gateway District” project which will provide a mixed-use conference center, and high-rise hotel accommodations, along with infrastructure improvements to significantly enhance the student, fan, and support experience.

Read More

Moving Trackout Control Along a Five-Mile Utility Corridor

On a five-mile utility project stretching along US Highway 395, Aspen Developers replaced temporary rock entrances with a single set of FODS Trackout Control Mats, relocating the same mats as construction advanced to reduce labor, equipment time, and recurring aggregate costs.

Read More

State Resources

International Partners

© 2026 FODS. All Rights Reserved.