Keeping Construction Sediment Off the Streets at the Chrysler Museum

FODS-on-Chrysler-Art-gallery-Virginia-1x5t-layout
tcm

Layout

1x5T

FODS Trackout Control Mats helped manage sediment trackout and maintain cleaner surrounding streets during the Chrysler Museum's $30 million Perry Glass Studio expansion in Norfolk, Virginia.

During the $30 million expansion of the Chrysler Museum of Art's Perry Glass Studio in Norfolk, Virginia, construction firm Hourigan faced the challenge of managing extensive construction activity within an established cultural campus. With limited space, ongoing museum operations, and public streets surrounding the site, controlling mud and sediment was an important part of the project. FODS Trackout Control Mats provided a reusable construction entrance designed to help reduce sediment trackout, maintain cleaner surrounding surfaces, and support site operations throughout construction.

Expanding One of Virginia's Leading Cultural Institutions

The Chrysler Museum of Art is a major cultural destination in Norfolk, Virginia, known for its extensive art collection, educational programming, and commitment to community engagement. Among its most popular attractions is the Perry Glass Studio, which opened in 2011 as a 9,200-square-foot facility dedicated to glassmaking demonstrations, classes, and artistic development.

Over the following decade, the studio became an important part of Norfolk's growing arts community. Its glassblowing classes, visiting artist programs, and educational partnerships attracted increasing interest, creating demand for additional space and more advanced facilities.

To accommodate this growth, the Museum launched a $30 million renovation and expansion that would more than triple the size of the original studio. The project was part of a broader $55 million capital campaign supported by more than 300 donors, the City of Norfolk, and the Commonwealth of Virginia.

Led by construction and development firm Hourigan, with architectural design by Work Program Architects, the project transformed the original facility into a 33,200-square-foot center for glassmaking education and artistic collaboration.

The expansion introduced a new amphitheater-style hot shop for glassblowing demonstrations, specialized classrooms, cold-working and flame-working areas, and additional spaces for artists, educators, and visitors. The building also incorporated modern mechanical and electrical systems designed to support the specialized equipment and high temperatures associated with glassmaking.

Beyond the interior improvements, the project included substantial site development, landscaping, pedestrian improvements, and stormwater management features. A new rain garden with native salt-tolerant plants was incorporated into the landscape as part of the Museum's coastal resilience strategy.

Construction began in March 2023 and was completed in phases, with the expanded facility officially celebrating its grand opening in March 2025.

The Challenge: Controlling Construction Trackout on an Active Museum Campus

FODS-on-Perry-Glass

Unlike construction projects located on open land, the Perry Glass Studio expansion took place within an established urban campus surrounded by public streets, pedestrian areas, and neighboring properties.

The project required significant demolition, excavation, foundation installation, concrete placement, and structural construction. At the same time, the Museum needed to maintain access to its existing facilities and minimize disruptions to visitors and the surrounding community.

Before construction could begin, the parking lot adjacent to the original Perry Glass Studio was closed to accommodate equipment, staging areas, and the new building footprint. Visitor parking was redirected to other nearby locations, while construction fencing and temporary access arrangements were established around the work zone.

The site's limited footprint meant that construction activities had to be carefully coordinated. Material deliveries, heavy equipment, and construction vehicles needed to move through designated access points without unnecessarily affecting nearby public areas.

Early site preparation involved removing existing pavement and vegetation to make room for the expansion. Foundation construction introduced additional challenges, including the installation of hundreds of rigid inclusions extending deep below the surface to stabilize the ground and support the new structure.

These activities created conditions where dirt, mud, and loose construction materials could accumulate on vehicle tires as trucks moved through the work area.

As vehicles exited the site, sediment trapped in tire treads had the potential to be carried onto adjacent paved surfaces and public roadways. Without an effective trackout control system, this material could contribute to additional cleaning requirements, stormwater runoff concerns, and potential safety hazards.

For a public-facing institution like the Chrysler Museum, maintaining clean and accessible surrounding areas was particularly important. Construction was taking place alongside an active cultural destination, where visitors, employees, contractors, and neighboring businesses all shared the surrounding infrastructure.

Traditional rock construction entrances are commonly used to reduce sediment trackout, but they can present challenges on projects with limited space and changing site conditions.

Aggregate entrances can accumulate sediment over time, requiring regular maintenance and additional stone to maintain their effectiveness. Depending on site conditions, they may also require excavation and replacement as construction progresses.

For a project involving extensive site preparation, multiple construction phases, and limited available space, Hourigan needed a practical way to manage sediment at the construction entrance while accommodating ongoing vehicle traffic.

The Solution: Installing FODS Trackout Control Mats

FODS on Chrysler Art Gallery

As construction activities began in spring 2023, Hourigan installed FODS Trackout Control Mats in two 1x5T configurations at the Perry Glass Studio construction site. The two layouts provided designated tire-cleaning surfaces to help control mud, dirt, and debris carried by construction vehicles.

The installation was also featured by name on the Chrysler Museum of Art's official website. In its April 3, 2023 construction update, the Museum highlighted the bright yellow FODS mats and explained how the reusable system helps remove sediment from vehicle tires, maintain a cleaner construction site, and minimize runoff.

Each mat features a series of raised, staggered pyramids engineered to flex vehicle tire treads as trucks drive across the surface. This movement helps dislodge mud, sediment, and other debris trapped between the tire treads before vehicles reach surrounding roadways.

As material is released from the tires, it collects in the spaces between the pyramids, where it can be removed during routine maintenance. Unlike traditional aggregate construction entrances, which rely on a layer of stone to help remove sediment from tires, FODS provides a reusable surface designed for repeated construction vehicle traffic.

The mats can also be cleaned while remaining installed, reducing the need for ongoing aggregate replacement and disposal. For the Perry Glass Studio expansion, the installation established a designated trackout control point during the early stages of construction, when excavation, site preparation, and foundation activities were underway.

The modular design of FODS also offers flexibility for construction projects where access requirements change over time. Individual mats can be disconnected, relocated, and reconfigured to accommodate different vehicle routes or construction phases.

This flexibility is particularly useful on urban construction sites, where available space is limited and access points may need to be adjusted as work progresses.

With an expected service life exceeding ten years under suitable operating conditions, FODS mats can also be removed and reused on future projects rather than being discarded at the end of construction.

Supporting Site Cleanliness Throughout Construction

Following the initial site preparation and foundation work, construction progressed through several major phases as the new Perry Glass Studio began to take shape.

Crews completed structural improvements, installed building systems, and developed the specialized spaces required for glassmaking operations. Exterior construction included brick veneer, terracotta panels, metal cladding, and other architectural elements designed to complement the existing Museum campus.

The project also required extensive mechanical, electrical, and plumbing work to support the building's specialized equipment, including furnaces and ventilation systems used for glassmaking. By early 2024, crews were completing major interior and exterior improvements, including the installation of mechanical equipment, electrical systems, observation areas, and architectural finishes.

Site development continued alongside building construction. Work included curb and gutter installation, underground utilities, pedestrian circulation improvements, and landscaping around the expanded facility. Throughout these activities, managing construction traffic and keeping surrounding surfaces clean remained important site management considerations.

The FODS installation provided a reusable tire-cleaning surface designed to help limit sediment transfer from construction vehicles before they exited the work area. Because the mats operate mechanically, they do not require the water consumption, pumps, or external power associated with traditional wheel-washing systems.

The ability to remove accumulated sediment from between the pyramids also simplifies routine maintenance. Rather than continually replenishing aggregate, crews can clean the mats and maintain the existing entrance surface.

For construction projects located near public facilities, these features can help reduce the ongoing maintenance demands associated with trackout control.

The Museum's decision to highlight the FODS installation in its public construction updates also demonstrates the importance placed on managing construction impacts from the beginning of the project.

Although project-specific performance measurements and maintenance savings were not publicly reported, the installation illustrates how reusable trackout control technology can be incorporated into construction planning at an active cultural institution.

A Completed Expansion with Long-Term Community Benefits

FODS on Chrysler Art Galler 1x5T layout

The Perry Glass Studio expansion reached a major milestone in September 2024 when the new studio space reopened for classes and demonstrations. Renovations to the original facility continued as the project entered its final phase.

By early 2025, the full expansion was complete, creating a modern glassmaking center more than three times the size of the original facility.

The Museum celebrated the grand opening from March 28 through March 30, 2025, welcoming artists, visitors, and community members for glassmaking demonstrations, performances, educational activities, and special events.

The completed facility significantly expanded the Museum's ability to offer classes, host visiting artists, and provide public demonstrations. Its new hot shop theater allows larger audiences to observe glassmaking, while dedicated workspaces support a wider range of artistic techniques and educational programs.

For Hourigan, delivering the expansion required coordinating specialized construction activities within an active museum environment while managing access, site logistics, and surrounding infrastructure.

The project demonstrates the challenges that contractors face when working on established public campuses, where construction operations must coexist with ongoing community activity.

By incorporating FODS Trackout Control Mats into the site's early construction preparations, the project included a reusable solution designed to help control sediment movement and maintain cleaner surrounding surfaces.

The installation also highlights the value of considering trackout control early in the construction process, particularly on projects involving excavation, heavy equipment, and limited space.

A Practical Trackout Control Solution for Urban Construction

The Chrysler Museum's Perry Glass Studio expansion demonstrates the importance of effective sediment control when construction takes place within an active public environment. With limited space, ongoing museum operations, and surrounding public streets, managing construction traffic required a practical and adaptable solution.

By installing FODS Trackout Control Mats in two 1x5T configurations, Hourigan established reusable construction entrances designed to help dislodge mud and debris from vehicle tires before they reached surrounding paved surfaces.

The mats provided a mechanical tire-cleaning solution without requiring external water or power, while offering the durability and flexibility needed for changing construction environments. Their reusable design also provides an alternative to traditional aggregate entrances that require ongoing replenishment and maintenance.

The Perry Glass Studio project highlights how FODS can support construction operations at museums, educational institutions, healthcare facilities, and other public-facing developments where maintaining clean surrounding areas and minimizing construction impacts are important considerations.