Versatile Easy & Reliable Performance
The Solution For Freeway Projects
Many bridge projects use an accelerated building construction method.
As a bridge is being constructed and equipment moves along the length of the bridge, FODS entrances can be easily moved along the length of the bridge from construction site entrance to construction site entrance.
FODS offers an accelerated installation and removal process. In minutes, FODS Trackout Control System can be laid end to end, connected together with steel hardware and can be configured to any entrance layout.
FODS Reusable Rockless Construction Exits effectively reduces trackout and sediment from leaving a bridge construction site, and can be installed on a wide range of substrates including soil, asphalt, and concrete.
FODS Vehicle Tracking Pads offer a compact versatile construction entrance.


Works Across Substrate Changes
Deploy FODS on an Jobsite
As bridge access roads and temporary lanes shift from soil to concrete or asphalt, FODS performs consistently across all surfaces, requiring no surface prep

Supports Safety in Tight Spaces
Conforms to any Site Requirements
Many bridge sites are confined with high vehicle density. FODS’ low-profile, non-slip surface enhances safety by reducing mud buildup, dust clouds, and uneven terrain