Posts tagged Arizona
MCAS - Yuma Adds a New Weapon to their Arsenal

FOD management at MCAS Yuma relied on labor-intensive manual inspections—a time-consuming process that, while adequate, left room for improvement. In May 2024, the air station introduced a new solution: FODS Trackout Control Mats. The results exceeded expectations and redefined FOD management at one of the U.S. Marine Corps’ most critical installations.

Read More
Meta Data Center

DPR Construction is building another data center for Facebook’s parent company Meta leveraging extensive experience on large scale projects with high standards for environmental responsibility. The new facility will span 2.5 million square feet, and be powered by 100% renewable energy. Similar to previous data center builds, DPR Construction leveraged FODS Trackout Control System to provide an effective BMP for high traffic applications.

Read More