The Solution For Aviation Construction FOD Control
The EPA has recently taken steps to manage the closure of approximately 500 unlined coal ash surface impoundments across the country that have been receiving coal ash and other coal combustions residuals (CCR). Coal Ash closures can take between 8 1- 10 years to complete and require a long term, effective construction entrance that can ideally be maintained without the need for additional materials to be shipped to the site.
The FODS Trackout Control System is ideal for remote projects all entrances can be shipped on a single truck and can be maintained on-site without additional materials. The mats can also be relocated throughout the project as the closure proceeds.