The Solution For Brownfield Site Containment

The EPA has recently taken steps to manage the closure of approximately 500 unlined coal ash surface impoundments across the country that have been receiving coal ash and other coal combustions residuals (CCR). Coal Ash closures can take between 8 1- 10 years to complete and require a long term, effective construction entrance that can ideally be maintained without the need for additional materials to be shipped to the site.

The FODS Trackout Control System is ideal for remote projects all entrances can be shipped on a single truck and can be maintained on-site without additional materials. The mats can also be relocated throughout the project as the closure proceeds.

Coal Ash Closure Construction Entrance To Reduce Off Site Vehicle Tracking North Carolina Belews Creek TransAsh And Duke Energy
Champlian Hudson Power Express FODS Trackout Control Mats industrial facilities.jpeg

Longevity & Reusability

Coal Ash renewal operation projects take multiple years to effectively remediate

FODS mats last 10+ years, making them ideal for the full lifecycle of coal ash closure operations without needing replacement or reinforcement

BOYD CAT South Charleston WV Coal Ash Remediation FODS Trackout Control Mats

On-Site Maintenance

FODS Trackout Control system have multiple maintenance methods all can be performed without disturbing the mats or underlying substrate

Because FODS does not rely on loose aggregate, no recurring deliveries are needed. Debris can be easily cleared from mats, and units can be relocated as construction zones shift over time.

Get A Quote