Heavy Civil

Bridge Projects

Versatile Easy & Reliable Performance

The Solution For Freeway Projects

Many bridge projects use an accelerated building construction method.

As a bridge is being constructed and equipment moves along the length of the bridge, FODS entrances can be easily moved along the length of the bridge from construction site entrance to construction site entrance.

FODS offers an accelerated installation and removal process. In minutes, FODS Trackout Control System can be laid end to end, connected together with steel hardware and can be configured to any entrance layout.

FODS Reusable Rockless Construction Exits effectively reduces trackout and sediment from leaving a bridge construction site, and can be installed on a wide range of substrates including soil, asphalt, and concrete.

FODS Vehicle Tracking Pads offer a compact versatile construction entrance.

FODS Getfods Bridge Construction Entrance Construction Entrance Construction Exit Rumble Strip Replacement Rip Rap Erosion Control Stabilized Construction Entrance Plastic Portable Durable
Portland Oregon Blumenaure Bridge Portland Bureau of Transportation

Works Across Substrate Changes

Deploy FODS on an Jobsite

As bridge access roads and temporary lanes shift from soil to concrete or asphalt, FODS performs consistently across all surfaces, requiring no surface prep

I-4 Expansion project miami signature bridge project

Supports Safety in Tight Spaces

Conforms to any Site Requirements

Many bridge sites are confined with high vehicle density. FODS’ low-profile, non-slip surface enhances safety by reducing mud buildup, dust clouds, and uneven terrain

Get A Quote