FODS In The Field: Oil Well Access Road

 

FODS Trackout Control System installed by Customer Mustang Extreme Environmental Services on a newly drilled oil well site.

With the stabilized construction entrance often only required for 3-6 months on new oil well sites, the ability to install and remove the FODS Trackout Control System in less than an hour, makes it ideal solution for access roads.

With a 10yr+ product life, provides an excellent ROI for Oil & Gas Energy Firms while keeping sites in compliance.

Contact FODS to learn more about how our trackout control system can stop the mud on your project: 844-200-3637