Posts in Case Study
Tampa Convention Center Installs Scout Ground Protection Mats

FODS Ground Protection Mats were using during demolition work at Tampa Convention Center’s new waterfront meeting rooms. The mats were placed over existing brick work, which extended out to the Tampa River Walk, to provide site access for vehicles and pedestrians during demolition.

Read More
I-10 & I-12 College Flyover Ramp Project

The I-10 Flyover Ramp Project aims to reduce congestion from westbound I-10 traffic exiting onto the College Drive exit. The Flyover redirects traffic over the I-12 to eliminate the need to merge past multiple lanes of traffic. FODS Trackout Control System was deployed to reduce construction site sediment tracking.

Read More
Catbird: A New Concept Hybrid Hotel

The Catbird Hotel is constructed on the corner of Marion and Walnut in Denver’s RiNo Arts District. Using innovative building materials, construction crews would assemble each floor in under three weeks as the pre-manufactured structural and exterior panels were delivered to the site. Construction in urban environments requires contractors to deploy effective and safe BMPs to prevent sedimentation and water pollution from exiting vehicles. The FODS Trackout Control Mats were to used on all three site entrances to provide access to the frequent delivery trucks and construction vehicles.

Read More
1919 At Mile High Apartments

In response to rapid urban expansion, The Opus Group (Opus) began construction of its third multi-family development in Denver’s Jefferson Park neighborhood. The experienced building and engineering teams found solutions to the unique challenges posed by the varied topography and space constraints of the project. Opus installed FODS Reusable Construction Entrance System on the three entrances to minimize vehicle sediment tracking onto the active roads.

Read More
FODS Deployed on I-25 South Gap Project

Interstate 25 is a major north-south interstate which connects Denver and cities and communities along the Front Range to the National Highway System. The growing population prompted expansions both north and south of the Denver Metro area. FODS Reusable Construction Entrance System enables contractors to quickly establish stabilized access points during each phase of the project.

Read More
Cumberland County Landfill

The Cumberland County Landfill was opened in the 1970s and is a municipal solid waste landfill that contracts with residual waste generators in Pennsylvania and surrounding states. To minimize trackout, the FODS Stabilized Construction Entrance was installed near the site’s weigh station. The system provides an effective solution to vehicle sediment tracking enabling increased compliance at reducing operating costs.

Read More
Big Dry Creek Sewer Improvements Project

The Big Dry Creek Sewer Improvements Project involves the renovation of 14 miles of sewer pipeline in the city of Westminster, CO. The renovation will increase capacity and prepare the city’s infrastructure for future developments. The frequent relocation of construction zones throughout the project prompted the contractor to choose a reusable and portable construction entrance to stay compliant and mobile.

Read More
HealthONE Swedish Medical Center New Patient Tower

The HealthONE operated Swedish Medical Center undergoes a fourth major renovation to increase capacity with the development of a six-story new patient tower. The construction will be conducted while the hospital remains open presenting challenges which are met by innovative solutions.

Read More
LAX LAMP Project

Los Angeles Landside Access Modernization Program (LAMP) is under development by a Fluor JV. The project requires a construction entrance solution that can mitigate sedimentation, dust, and foreign objects (FOD) near airport access roads. FODS Trackout Control Mats were deployed in multiple locations throughout the project.

Read More
Ball Aerospace Expansion

Ball Aerospace Expansion Project in Broomfield near the Rocky Mountain Metropolitan Airport continues to operate a clean working area to reduce FOD and sedimentation from construction site exits. To provide the best possible performance, the contractor has installed FODS Trackout Control Mat System to clean vehicle tires as they exit the site.

Read More
New York Industrial Recycling Plant Replaces Wheel Wash

Faztec Industries Saves $4,500/mo By Replacing Wheel Wash BMP With FODS Mats. Recycling Plant and Transfer Station Construction Entrance Application.

Read More
CalTrans I-10 Tune Up Project Uses FODS TC-1 BMP

CalTrans I-10 Tune Up Project employs FODS Portable Construction Entrance/Exit for their TC-1 Erosion and Sediment Control BMP. The rockless construction entrance/exit system is safer on highway projects near active lanes of travel and avoid introducing rocks and debris into active roadways. In addition, highway projects like the CalTrans I-10 Rehabilitation are able to reduce costs by reusing the entrance on multiple phases.

Read More
FODS Combats Contaminants on Red Cedar Development Project

To combat construction trackout and cross contamination during the Red Cedar Development Project, FODS distributor interfaceh2o, provided Hoffman Brothers with a 1 x 8 mat FODS Reusable Construction Entrance configuration.

Read More
Marcellus Formation Fracking

Marcellus Formation Fracking requires high volumes of vehicles entering and exiting the site through the stabilized construction entrance. The operator of this site needed a heavy-duty, effective trackout control solution, so they installed the FODS Trackout Control Mats. Learn More.

Read More
FODS: The High-Tech Construction Entrance

The growth of technology companies is spurring demand for high-performance solutions for minimizing pollution both during and after construction. Technology companies often have unique needs for LEED standards energy sourcing to minimize their environmental impact. FODS Trackout Control Mats enable contractors to minimize trackout on a variety of demanding applications and preserve the natural water sources.

Read More
FODS Deployed at NASA's Kennedy Space Center

NASA uses FODS at Kennedy Space Center as a soil tracking prevention device on the Crawlerway improvement project.

Read More
FODS Gains Traction In Texas

Industries across Texas are using FODS to provide cost-effective, and environmentally friendly construction entrances that reduce trackout and maintenance.

Read More
Nashville Projects

FODS is used on multiple projects throughout Tennessee. TDOT approval opens doors for Kiewit to use FODS on I-440 project. The town of Gallatin welcomes a large datacenter with high-volume clean energy demands. New Nashville Fairgrounds Stadium project uses FODS to stop the mud.

Read More
Central 70 Project

At over 30 years beyond the expected lifespan of the bridge, Central I-70 was showing signs of age in terms of both deterioration and traffic congestion. The Central 70 Project addressed future growth needs by renovating a 10 mile stretch of I-70.

Read More
O'Hare International Airport

FH Paschen reduces aviation FOD with FODS Reusable Construction Entrance on $8.5 Billion O’Hare 21 Project.

Read More