INSTALLATION  

The site where the FODS Trackout Control System is to be placed should correspond to Best Management Practices as much as possible and should also meet or exceed the local jurisdiction or storm water pollution prevention plan (SWPPP) requirements.

Call for utility locates 3 business days in advance of the FODS Trackout Control System installation for the marking of underground member utilities. Call the utility notification center at 811.

Once the site is established where FODS Trackout Control System is to be placed, any excessive uneven terrain should be leveled out or removed such as large rocks, landscaping materials, sudden abrupt changes in elevation, and similar. FODS will span and support over most obstacles, but the flatter and smoother the terrain under the mats the more efficient and safer the FODS Trackout Control System will be.

 
FODS Trackout Control System Install

Step 1

PLACE MATS IN THE PROPER POSITION

 

FODS Trackout Control System Install
FODS Trackout Control System Install

Step 2

ADD H BRACKET BETWEEN MATS

 

STEP 4

STEP 4

FODS Trackout Control System Install

Step 3

CONNECT MATS WITH METAL STRAPS

 

FODS Trackout Control System Install

ANCHOR MATS IN PLACE